Antioch Cape Seal Project 2020

The work shall generally consist of the placement of an ½-inch PMAR Chip Seal with an application of Micro-surfacing on top (i.e. Antioch Cape Seal) to residential streets. Additional work shall include, but not be limited to, surface preparation, removal of vegetation, pavement markings and markers, installation of permanent pavement markings and markers, traffic control, water pollution control and all other work shown on the plans.
Addendum 1 (click to expand/collapse)
Name Size
P.W. 328-12 Addendum No. 1 1.4 MB