Public Jobs

Bidding Closed
7/7/20 2:00 pm
Curb, Gutter and Sidewalk Repair PW 507-17
City of Antioch
Various locations within the City of Antioch, California
The work shall consist of the removal and replacement of existing curb and gutter, sidewalk, driveway and valley gutter sections; tree removal, stump grinding, root pruning; and other miscellaneous concrete projects including but not limited to the installation of stamped colored concrete, constructing concrete curb ramps and reconstructing storm drain catch basin tops.
Bidding Closed
3/31/20 2:00 pm
Antioch Cape Seal Project 2020
City of Antioch
Various Locations in Antioch, CA
The work shall generally consist of the placement of an ½-inch PMAR Chip Seal with an application of Micro-surfacing on top (i.e. Antioch Cape Seal) to residential streets. Additional work shall include, but not be limited to, surface preparation, removal of vegetation, pavement markings and markers, installation of permanent pavement markings and markers, traffic control, water pollution control and all other work shown on the plans.
Bidding Closed
12/17/19 2:00 pm
Water Main Replacement at Various Locations PW 503-18
City of Antioch
Delta Fair Boulevard from Belle Drive to Chickie Street; Kendree Street from Belle Drive to Delta Fair Boulevard; Putnam Street from G Street to Lone Tree Way; W. Tregallas Road from G Street to D Street; San Joaquin from Alcala Street to W. Tregalla
Work to be Performed: The work shall generally consist of installing domestic water facilities in the areas shown on the plans. Additional work shall include, but not be limited to, surface restoration, traffic control, water pollution control and all other work shown on the plans.
Bidding Closed
12/17/19 2:00 pm
Prewett Park Deck Coating Replacement PW 567-8
City of Antioch
Prewett Family Water Park located at 4701 Lone Tree Way, Antioch, CA.
Work to be Performed: The work shall generally consist of removing and replacing deck coating. The work shall include, but not be limited to, removing and replacing concrete stairs, adjusting existing facilities to grade, relocating and reinstalling existing facilities, water pollution control and all other work shown on the plans.
Bidding Closed
10/15/19 2:00 pm
CDBG Downtown Roadway Pavement Rehab Ph 8
City of Antioch
Antioch, CA
The work shall generally consist of roadway reconstruction, cold planing existing roadway sections, installing asphalt concrete plugs and roadway overlays, constructing concrete curb, gutter, sidewalk, valley gutter and curb ramps, removing and relocating existing facilities, tree removal, adjusting utilities to grade, placing pavement markings and markers, traffic control, water pollution control and all other work shown on the plans.